top of page
Profile
Join date: Jul 23, 2025
Posts (19)
May 31, 2026 ∙ 1 min
Kiwifruit Orchard Sub-Surface Drainage Installation
qualine completed a sub-surface land drainage project for a kiwifruit orchard in Pakowhai, Hawke’s Bay.
The orchard was showing clear signs of waterlogged soil, with some plants struggling and others already lost due to excess moisture around the root zone.
26
0
May 3, 2026 ∙ 1 min
Kiwifruit Orchard Drainage Installation
Aqualine completed a kiwifruit orchard drainage project in Ōpōtiki, installing just under 7,800 metres of Novaflow through the orchard rows.
40
0
Mar 26, 2026 ∙ 1 min
Water Reticulation Project
Poukawa – Hawke’s Bay Overview Aqualine completed a farm water reticulation install in Poukawa, supplying water from a natural river source across the property. Using mole ploughing, pipe was installed efficiently over long distances with minimal ground disturbance. What we dID Installed approx. 7900m of pipeline using mole ploughing Supplied and installed 36 concrete troughs Distributed water from river source across the farm Commissioned system for reliable day-to-day use Each section was...
67
0
info8839837
Admin
More actions
bottom of page
