Now Twice as Reliable
Joining two water systems together to form a much more secure and reliable farm water supply was a smart decision to make. Aqualine Contractors worked along side Harris Pumps & Filtration on this project to implement the idea. Harris Pumps done the design, supplying of materials and the pump shed works. Whilst Aqualine Contractors part was to dig/set up a new water gallery intake, mole plough in 2800m of 63mm mainline, 3000m of gravity pipelines, relocate two break down tanks