Kiwifruit Orchard Drainage Installation

  • 12 hours ago
  • 1 min read

Updated: 10 hours ago

Ōpōtiki



Overview

Aqualine completed a kiwifruit orchard drainage project in Ōpōtiki, installing just under 7,800 metres of Novaflow through the orchard rows.


The system was installed to help move surface water away from the root zone, reducing the risk of wet ground affecting access, soil condition, and long-term plant health.


Novaflow was laid through the rows with the correct fall to keep water moving through the drainage system and away from the block.


This project was a practical drainage solution for an active orchard environment, completed with care around the existing rows.


Project Summary:

Location: Ōpōtiki

Service: Kiwifruit orchard drainage installation

Product Used: Novaflow drainage pipe

Installed: Just under 7,800m

Result: Improved surface water drainage through orchard rows