Kiwifruit Orchard Drainage Installation
- 12 hours ago
- 1 min read
Updated: 10 hours ago
Ōpōtiki
Overview
Aqualine completed a kiwifruit orchard drainage project in Ōpōtiki, installing just under 7,800 metres of Novaflow through the orchard rows.
The system was installed to help move surface water away from the root zone, reducing the risk of wet ground affecting access, soil condition, and long-term plant health.
Novaflow was laid through the rows with the correct fall to keep water moving through the drainage system and away from the block.
This project was a practical drainage solution for an active orchard environment, completed with care around the existing rows.
Project Summary:
Location: Ōpōtiki
Service: Kiwifruit orchard drainage installation
Product Used: Novaflow drainage pipe
Installed: Just under 7,800m
Result: Improved surface water drainage through orchard rows
Aqualine – the trusted name for mole ploughing, trenching, earth moving, drainage, orchard ripping, water intakes and reticulation across Hawke’s Bay.
06 879 6238




























