Precision Trenching & Water Reticulation for Instant Green Irrigation
This job for Instant Green Limited required accuracy from start to finish. The 110mm main line needed to be installed at a very specific depth, as pop-up sprinklers were going directly on top of the pipe. That meant the skid pads and trench profile had to be lined up perfectly before the pull began.


Start with a Solid Foundation!
Over 300 tonnes of limestone later, you have an impressive solid base for the house foundations! Last month we were out at Maraetotara...


Forming driveways the right way
Our driveways are usually the first thing people see. You want it looking sharp and one that will last well! Following a recent purchase...


Shaping up nicely...
Here's some great drone footage of a recent earthworks project. This project involved; stripping and carting away topsoil, supplying and...


A Smart Choice....
Aqualine has recently completed a major earth works redevelopment for a local farmer. Using a 10 tonne digger, our team undertook the...


Irrigation installation made easy
No matter what size pipe you have to put in the ground, from 10mm trickle irrigation to 450mm water mains Aqualine trenchers/contractors...