top of page

Open Trenching for Power Mains & Water Reticulation

ree


This project involved open trenching to install power mains needed to activate a new water source. With services crossing the site and strict levels to follow, the team worked through the alignment carefully to ensure everything was set at the correct depth before the cables and pipework went in.



ree


The trench profile was kept clean and consistent from end to end, allowing the installation to be completed smoothly. Once backfilled and compacted, the site was left tidy and ready for the next stage of the water system setup.


Project Summary

Location: Hawke’s Bay, New Zealand

Service: Water Reticulation & Power Main Trenching

Duration: 1 Day

Result: Accurate trenching for power mains and water reticulation, clean backfill, and a ready-to-connect power supply for a new water source.



ree



 
 
 

Comments


bottom of page