This job north of Taupō came with one main challenge, next to no room to move. With tight boundaries and limited access through the block, every metre required careful planning, accurate positioning, and steady hands on the controls.



ree


We installed just over 6 kilometres of 63mm piping, complete with tracer wire for future location and servicing. Despite the restricted workspace, the team kept the line straight, the depth consistent, and the pull clean from start to finish.


The result is a tidy, well-protected main line now in place, giving the landowner a durable and serviceable water supply solution built to last.



Project Summary

Location: North of Taupō, New Zealand

Service: Pipeline Installation, 63mm Main Line with Tracer Wire

Duration: 3 Days

Equipment Used: Mole plough, excavator, trenching support gear

Result: Over 6kms of 63mm pipe and tracer wire installed through extremely tight access areas. Clean pull, tidy finish, and a reliable new line ready for service.