Precision Trenching & Water Reticulation for Instant Green Irrigation

ree


This job for Instant Green Limited required accuracy from start to finish. The 110mm main line needed to be installed at a very specific depth, as pop-up sprinklers were going directly on top of the pipe. That meant the skid pads and trench profile had to be lined up perfectly before the pull began.



ree


Using laser-guided trenching and careful setup, the team achieved a clean, consistent line and ideal depth the entire way. Once the heave was packed back in, the ground settled beautifully, you’d barely know we’d been there.


A tidy, precise install ready for an efficient irrigation system.


Project Summary

Location: Hawke’s Bay, New Zealand

Service: Water Reticulation & Trenching, 110mm Main Line Installation

Duration: 2 Days

Equipment Used: Laser-guided trencher, excavator

Result: 110mm pipe installed at exact depth required for pop-up sprinklers, perfectly aligned skid pads, clean backfill with minimal surface disruption.