top of page
Recent Posts




Archive
Tags


Mole Ploughing
Fast, tidy pipe installation with minimal ground disturbance Overview Mole ploughing is the most efficient way to install pipes and cables where speed, cleanliness, and soil integrity matter. Our vibratory mole plough installs pipe below ground with virtually no surface disruption, no open trench, no backfilling, no mess. This method is ideal for established pasture, orchards, vineyards, and finished land where reinstatement matters. What we do Water reticulation and irrigati


Chain Trenching
Purpose-built trenching for water, power, and infrastructure Irrigation | Water Reticulation | Stormwater | Sewer | Power | Telecoms Overview Chain trenching is the backbone of modern water and services infrastructure. When accuracy, depth control, and reliability matter, our chain trenching systems deliver clean, consistent trenches across a wide range of ground conditions. From tight orchard rows to large-scale farm reticulation schemes, we trench with purpose, setting syst


Drain Cleaning & Root Removal from Blocked Tile Drain
This job revealed one of the biggest tree roots we’ve ever found inside a tile drain. The blockage was restricting water flow and causing surface issues on the paddock above.
The team exposed the line, cleared out the obstruction, and restored the drain to full capacity. A good reminder of how much can happen below ground before anything is visible on top.


Multiple Trough Installations for a Patoka Dairy Farm
This dairy farm in Patoka wanted a second trough in nearly every paddock. The goal was simple, reduce walking distances for stock and increase the overall availability and storage of water on the farm.


Trough Upgrades & New Water Lines – Elsthorpe
A new property purchase in Elsthorpe meant starting fresh with the water system. The old troughs were removed and replaced with new, reliable units. Additional pipework was also pulled in to help subdivide and supply paddocks more efficiently.


Open Trenching for Power Mains & Water Reticulation
This project involved open trenching to install power mains needed to activate a new water source. With services crossing the site and strict levels to follow, the team worked through the alignment carefully to ensure everything was set at the correct depth before the cables and pipework went in.
bottom of page


