Multiple Trough Installations for a Patoka Dairy Farm
This dairy farm in Patoka wanted a second trough in nearly every paddock. The goal was simple, reduce walking distances for stock and increase the overall availability and storage of water on the farm.


Trough Upgrades & New Water Lines – Elsthorpe
A new property purchase in Elsthorpe meant starting fresh with the water system. The old troughs were removed and replaced with new, reliable units. Additional pipework was also pulled in to help subdivide and supply paddocks more efficiently.


Open Trenching for Power Mains & Water Reticulation
This project involved open trenching to install power mains needed to activate a new water source. With services crossing the site and strict levels to follow, the team worked through the alignment carefully to ensure everything was set at the correct depth before the cables and pipework went in.


Precision Trenching & Water Reticulation for Instant Green Irrigation
This job for Instant Green Limited required accuracy from start to finish. The 110mm main line needed to be installed at a very specific depth, as pop-up sprinklers were going directly on top of the pipe. That meant the skid pads and trench profile had to be lined up perfectly before the pull began.


Precision Pipeline Install Through Tight Access in Taupō
This job north of Taupō came with one main challenge—next to no room to move. With tight boundaries and limited access through the block, every metre required careful planning, accurate positioning, and steady hands on the controls.


4.5kms of Pipeline Installed Under the Ruahine Range
We recently wrapped up a major water reticulation project right at the base of the Ruahine Range, installing 4.5 kilometres of new pipelines and 13 fresh troughs across steep hill country.